• Tuesday

    • Uber obviously runs google maps under the hood. This has cost ~20m a year (not that much) for the past few, plus some equity.
    • Reread a lot of my study materials for software engineering. Like to refresh every now and then.
    • FULL MOVE-IN DAY.
    • Got all my actual belongings delivered. The whole load from Hermosa.
    • Set up the wlan/lan repeater. Awesome utility.
    • Vehicles.
      • Bikes in garage!!!
      • 5 prepaid vouchers ($22/day for residents). Using 1 for 1-day ninja until it gets picked up. The others will go toward ducati/bmw until the new month rolls over. They’ll let me know.
      • Ninja got picked up later. Signed over the title. Submitted the notice of transfer and release of liability online (dmv).
      • Deleted the BMW and the Ninja from mint.
      • DMV. Took about an hour. Swapped the DL from CA to NY. Can’t get the READ ID yet, need a new SS card.
      • Need to create another appointment to transfer the ducati registration to NY, that office only does license stuff.
      • Drove around manhattan on the panigale for about an hour at dusk. Amazing.
    • Washer/dryer.
      • Electrician was here for half an hour. 40A unit. Fridge is 7A. Dishwasher is 3A. Need to keep washer + dryer (running at the same time) under 20A, or each individually under 20A if running at separate times.
      • Need to get a ventless dryer. But water can be routed to the front closet or the bathroom closet, no problem.
    • Flooring.
      • Believe the original parquet is 1/4″ thick. So if we grind/sand the humps down it, it will be plenty level to lay vinyl over.
      • Guy was much better than home depot. Doesn’t worry about the humps.
      • Need 870sqft and 6ft of reducer for the kitchen tile. Min wear layer 3mm. Engineered hardwood on top is fine. Sand the humps down, grind the door. Lay over. Need base shoe of course.